日本五十熟hd丰满-日韩电影一区二区三区-97人妻精品一区二区三区软件-亚洲免费二区-欧美成人三级-亚洲影院一区-欧美一级一区-久草99-天天爱av-成人在线欧美-国产精品麻豆成人av电影艾秋-啪啪免费视频网站-久久色图-欧美综合视频在线-日韩高清欧美-亚洲伦理自拍-国产精品刺激-在线无码va中文字幕无码-亚洲免费一区视频-黄网在线免费

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Xing Long water control pivot project

2009-04-21

  With all kinds of projects staring working in 2009, our products have been sold to everywhere. Recently, many SG40A and SG40E wall grabs were delivered to Xing Long water control pivot project in Hubei province. They will be playing an important role in the South-to-North Water Diversion Project.


 

  As one of the middle and lower reaches of Yangtse River four training works of the first-stage construction of South-to-north water Diversion Project, Xing Long water control pivot project was started working on Feb 26. This project is the first-class project of South-to-North water Diversion Project, located in Hubei province. It is important for speeding the construction pace in South-to-North water Diversion Project and comprehensive treatment of Han River, as well as in the sustainable development of local place.

  Xing Long water control pivot project is started with anti-seepage, headrace and bridge, the anti-seepage walls are constructed by Sino Hydro Foundation Engineering Co., Ltd and Gezhouba Group Foundation Co. These walls will be digged in 0.8m width, and 66m depth, the stratum is complicated with Iron Plate sand. When choosing the machines, construction companies compared with all kinds of machines at home and abroad in performance, operation and price factors. At last, Our SG40A and SG40E were chosen by much strongpoint. Till then end of Feb, there are 4 units had been working in this jobsite.

  Now according to the requirements, more Jintai wall machines will go for the project.
It is the great honor for us that Jintai SG40A and SG40E were chosen to work in this water control pivot project. It will also inspire us to move forward for contributing to National’s projects.