日本五十熟hd丰满-日韩电影一区二区三区-97人妻精品一区二区三区软件-亚洲免费二区-欧美成人三级-亚洲影院一区-欧美一级一区-久草99-天天爱av-成人在线欧美-国产精品麻豆成人av电影艾秋-啪啪免费视频网站-久久色图-欧美综合视频在线-日韩高清欧美-亚洲伦理自拍-国产精品刺激-在线无码va中文字幕无码-亚洲免费一区视频-黄网在线免费

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Shanghai Jintai Presenting the largest width hydraulic diaphragm wall grab with 1.5m in China

2009-02-23

    At present, SG 40A hydraulic diaphragm wall grab made by Shanghai Jintai struts its stuff during the construction of Changjiang tunnel of Wuhan subway line 2. The grab with 1.5m width and 2100L volume is the largest in China and finished 1.5m width and 48m depth notch within 13 hours, which created new record in width formation and construction efficiency of diaphragm wall construction.


 


    The Changjiang tunnel project of Wuhan subway line 2 is complex in geological situation with upper soft layer and lower rigid layer. The backfill soil layer and clay layer are between 1m and 15m under ground, sand layer is 16m—48m under ground and cobble and sand layers are 48m under ground. The tunnel project has very high construction requirement, for example, even if the foreign machine is used, the high cost and low efficiency will be incurred. But the 1.5m hydraulic diaphragm wall grab made by Jintai has solved such problem and won the good praise from the customers.

    The successful presence of SG 1500 hydraulic diaphragm wall grab indicates that Shanghai Jintai has stepped further, which reduces the cost, provides the important guarantee to the country’s infrastructure construction and has profound meaning to piling machinery industry in our country.